![]() O Route G Northbound will be detoured via Woodland Ave., left on 61 st St., right on Kingsessing Ave., left on 58 th St., and regular route resumes. ![]() O Route 11 Westbound will be detoured via Woodland Ave., right on 58 th St., left on Kingsessing Ave., left on 61 st St., right on Woodland Ave., and regular route resumes. O Route 11 Eastbound will be detoured via Woodland Ave., left on 61 st St., right on Kingsessing Ave., right on 58 th St., and regular route resumes. Also, the Route G will not make stops at 58 th and Woodland and 58 th & Greenway during the project. o NOTE: For the duration of the project, the 60 th and Woodland stop will be eliminated in both directions for both the Route 11 and Route G. Check for travel information or call Customer Service at 21. ![]() – Routes G will be detoured, and Route 11 will be converted to bus and detoured for the duration of the project. – To allow for shopping center access, segments of Woodland Avenue will be reopened as work is completed. The street will be closed to through traffic. – This track renewal project to renew corroded and broken rail will result in the closure of Woodland Avenue between 58 th and 60 th streets. Construction will take place from February 28, 2022, through April 15, 2022. – This project involves the excavation and renewal of the existing trolley track on Woodland Avenue from 58 th Street to 60 th Street. ![]() 58 th Street & Woodland Avenue to 60 th Street & Woodland Avenue ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |